2013 Blog
December 2013
- Wasted section of right hand frame cut away
- Right hand water tank rear panels drilled and trial fitted
- Front tube plate removed
- Cleaning of interior of boiler barrel commenced
November 2013
- Wheels returned from South Devon Railway fully refurbished
- Smokebox removed from boiler barrel
- Rivets holding front tube plate in place all removed
- Last of the steel panels for the right hand water tank purchased
- New draw hooks obtained
October 2013
- Left hand frame repair section welded in
- Temporary construction area extended to take second water tank
- Repair of third sandbox started
- Left hand water tank dismantled and angle pieces cleaned and inspected
- Removal of rivets holding smoke box to boiler barrel has begun
September 2013
- Two sand boxes repaired and painted
- All tubes now removed from boiler together with accumulated scale and debris
- Left hand frame repair section tacked in place and slowly being welded up
- Removal of the smoke box from the boiler barrel has commenced
- Fundraising stall manned during weekend events at Bodiam and Robertsbridge
August 2013
- Two sand boxes repaired and painted
- All tubes now removed from boiler together with accumulated scale and debris
- Left hand frame repair section tacked in place and slowly being welded up
- Removal of the smoke box from the boiler barrel has commenced
- Fundraising stall manned during weekend events at Bodiam and Robertsbridge
July 2013
- Frames – damaged section at rear of left hand side cut out and repair sections for both left and right hand sides prepared and drilled. Remaining suspect rivets removed
- Cylinders and valve chest area needle gunned and coated in red oxide
- Good progess made on fabrication of right hand water tank
- GWR 5668 prepared for its move from Blaenavon to Rolvenden
June 2013
- Fabrication of right hand water tank commenced with plate being drilled
- Lower intermediate stretcher riveted to frames
- Brake cylinder strip down started
- Rear drag boxes cleaned, rivets replaced as necessary and painted
- One connecting rod acquired
May 2013
- Pony truck frame cleaned and painted
- Bunker fitting out commenced – handbrake column and oil boxes installed
- Boiler support band reinstated
- Crew steps completed
- Boiler detube commenced
- Steel for right hand tank ordered and delivered
April 2013
- Bunker riveting completed with ducket (where rear lamp is mounted) now installed
- Lower intermediate stretcher trial fitted, removed and riveted up
- Crew steps riveted up
- Right hand side tank totally dismantled and all angle pieces cleaned up for reuse
March 2013
- Bunker almost completed with 1,147 rivets installed so far
- Right hand water tank being dismantled after measurements taken. There are hundreds of rivets to be ground off here
- Front and rear cab sheets prepared for riveting
- Many more parts acquired including side rods and vacuum pump
February 2013
- Bunker riveting continues with water space and coal floor now completed
- Some 920 rivets are now in place
- Wheels sent to South Devon Railway for tyre turning
- Many new parts acquired and stored
- Dismantling of side tanks has commenced
- Grinding off of boiler tube ends in firebox prior to removal continues
January 2013
- Lower intermediate stretcher manufactured
- Rear frame tie manufactured
- Parts acquired including axle underkeep and cab window frames
- Cab steps manufactured – now awaiting riveting
- Bunker riveting commenced – Floor and sides completed
- Some 497 rivets now in place