2014 Blog
December 2014
- Rear panels completed for water tank
- Complete trial build of water tank finished
- Old white metal removed from slipper blocks
- Fabrication of horn grinding machine started
November 2014
- New coupled keeps and guide liners obtained for axle boxes
- All axle box rubbing plates removed
- Crack on frame by left leading horn repaired
- Top panels and baffles for left hand water tank completed
October 2014
- Front and rear buffers re-attached
- Crack in frame by left leading horn repaired
- Axle box brasses all re-white metalled
- Pony truck stretcher riveted in place
September 2014
- New chimney and blower injector ring received
- Both pony truck axle boxes fully machined
- Left hand water tank measured up for manufacture of rear panels
- £1,000 raised for the project from the sale of all the scrap metal
August 2014
- ll axle journals measured up for machining of axle boxes
- Machining of pony truck axle boxes started
- Construction of left hand water tank progressing well
- Successfull fund raising weekend at The Weald of Kent Steam Rally
July 2014
- All four buffers reassembled and finished
- Pony truck axle boxes get new white metal poured
- Construction of left hand water tank started
- New smokebox and door arrive
June 2014
- Pony truck stretcher rebuilt and bolted into frames
- Brake vacuum cylinder rebuilt
- Rear buffer beam riveted on
- Horns cleaned and examined
- Old white metal melted out of axle boxes
May 2014
- Rear buffer beam reassembled and bolted in place
- Weighshaft replaced in frames
- New cab floor frames bolted in place
- All suspension springs cleaned and examined
- Frame refurbishment continues
April 2014
- Weighshaft refurbished with new bushes
- Right hand frame repair section fully welded in and dressed
- New pony truck stretcher completed and trial fitted
- Brake vacuum tank stripped and being refurbished
- Smokebox stripped of re-usable parts
March 2014
- Refurbishment of another sand box completed
- Welding in of right hand frame repair section started
- Final panel of right hand water tank bolted into place prior to riveting. Over 1,800 rivets have been inserted so far
- Railway’s apprentice trained up in the art of riveting
February 2014
- Final build of the right hand water tank has commenced with 1,068 rivets put in place during the month
- Rebuilding of the sand boxes continues
- Brake cylinder removed from 5668 as a donor for 4253. Stripped, cleaned and painted
January 2014
- Right hand water tank trial build successfully completed
- Refurbishment/repair of tank furniture started
- 5668 moved to Rolvenden yard to prepare for storage
- New pony truck stretcher fabricated
- Right hand frame repair section now in place ready for welding