- Horn grinding machine undergone successful trials
- New front section of boiler barrel positioned and drilled
- All steel firebox stays now removed
- Majority of copper firebox stays drilled out
November 2015
- Axle boxes drilled for brass rubbing plates
- New smokebox assembled and door fitted
- New front handrails fabricated
- Front section of boiler barrel removed
- Superheater header studs removed and threads re-tapped
October 2015
- Fabrication of new cab completed
- Last of the riveting on the frames completed
- New smokebox sacrificial plate cut and drilled
- Overhaul of blast pipe, regulator box and superheater header started
- Majority of firebox stays now removed
September 2015
- Smokebox inner door and baffle constructed
- New cab structure ready for final riveting
- Horn grinding machine built to first testing stage
- Set of spring hanger pins fabricated
August 2015
- Riveting of door ring to smokebox and hinges to door completed
- Construction and trial assembly of new cab almost completed
- All firebox stays removed from backhead and throatplate
- New front running plate fitted
July 2015
- New drain cock castings machined
- New smokebox door fitted to smokebox ring
- Sand boxes completed and trial fitted
- Top beading and rear ducket fitted to bunker
June 2015
- Fitting out of new smokebox commenced
- Fabrication of new cab started
- New front running plate fabricated and trial fitted
- Majority of foundation ring rivets now removed
May 2015
- Construction of horn grinding machine progressed
- Internal motion components refurbished
- Start made on removal of boiler foundation ring
- Machining of new brake arm bearing cap castings starts
April 2015
- Fire grate support brackets removed
- Palm stays removed from boiler
- Boiler rivet removal progressing well
- Heads of all firebox copper stays cut off
March 2015
- Left leading horn replaced
- Riveting up of new left hand water tank almost completed
- Refurbishment of brake vacuum tank finished
- Valve assembly dismantled
- New drain cocks machined
February 2015
- Riveting of the second water tank begins
- Dismantling of the boiler progressing
- Machining of axlebox rubbing plate brasses continues
- Slide bars refurbished
January 2015
- Dismantling of the boiler started
- Trial build of second water tank completed
- Machining of axle box brass rubbing plates started
- Construction of temporary boiler house completed