2019 Blog
December 2019
- Firebox palm stays fettled and fitted ready for riveting
- New throatplate riveted to boiler section
- New steam heat shut-off valves made and fitted
- Crank pins and rods measured for machining bushes
November 2019
- New brasses for side rods rough machined
- Final welding in of throatplate finished
- New backhead cladding started
- Firebox lap seams caulked in
October 2019
- New cab tool boxes finished
- Boiler expansion brackets cleaned, checked and painted
- Majority of remaining firebox lap seam rivets replaced
September 2019
- More cladding sections and insulation pads fabricated
- Rivet holes under the boiler palm stays countersunk
- Various oil pots and pipework brackets made
- New racking and tool storage bins installed
August 2019
- Refurbishing of the rods commenced
- Piston swab boxes and covers finished
- Flexible brake cylinder pipe fitted
- Mesh sieves for water spaces made
July 2019
- Safety valve bonnet and new coupling shackles obtained
- New rocker shaft covers made
- Start made on fabricating new cylinder/valve cover cladding pieces
- Insulation pads for the above made
June 2019
- Motion return spring assembly fitted
- Trailling axle splashers made and fitted
- New condensing coil fitted to cab
- Main steam pipe removed from boiler for reburb
May 2019
- Boiler palm stays trial fitted
- All rivet/stay holes in throat plate pilot drilled
- Slipper blocks modified
- One set of slipper blocks white metalled
April 2019
- Tapping of the many firebox stay holes started
- Throat plate corners dressed to fit foundation ring
- Cab windows finished and fitted
- Final slide bar aligned and pinned
March 2019
- Throat plate dressing and drilling started
- New lamp brackets made
- Water valve operating mechanism fabricated
- Ashpan heat shield fabricated and fitted
February 2019
- New motion spring bracket components machined
- Ashpan riveting and welding completed
- Throat plate edges ground to fit foundation ring
- Driver’s side bottom slide bar fitted, aligned and pinned
January 2019
- Construction of new ashpan continues
- Boiler repair patch and superheater header NDT tested
- Front tank splashers repaired/refurbished and fitted
- Work started on installing new boiler throat plate